With more than four years of experience injecting biomethane into the grid and in the midst of constructing two new biogas and biomethane plants that will be commissioned in 2026, AGF has consolidated its national biomethane technology with demonstrable results. Since 2021, AGF has been successfully operating facilities that inject biomethane into distribution pipelines, continuously […]

AGF expands its industrial manufacturing capacity, reinforcing its technological position

AGF, as a technology and process engineering company, is developing its own manufacturing capabilities for high value-added components, such as industrial electrical panels, bases and process units, strengthening its role as a comprehensive technology supplier in the renewable gas industry. Since 2018, AGF has been developing in-house capabilities in electromechanical assembly, expanding its scope with […]

AGF’s 10th anniversary

Company History. AGF was officially incorporated on 18 February 2015, but its history of innovation and commitment to excellence began much earlier. Its majority partner and director, Francisco Guzmán, started out in the Spanish biogas sector before the company was incorporated, contributing his knowledge to biogas plants that were not working or were on the […]

ENCE acquires AGF’s technology

Planta de ENCE BIOGAS Gas Renovable

On 19 December 2024, ENCE announced the acquisition of the plant BIOMETAGAS LA GALERA. After a long process, ENCE has acquired one of the pioneering and most outstanding facilities in biomethane production in Spain. This event marks a significant milestone for ENCE, which enters the renewable gas sector, and consolidates the benchmark role of the […]

AGF has launched the Applied Research and Development Center (CIAD).

Investigación de gas renovable | biogás y biometano

AGF has launched a new site, the Center for Applied Research and Development (CIAD). It is located in the Scientific and Technological Park of Badajoz. This new expansion has been the result of the need to increase space and capacities for all R&D lines, also investing in new research staff. It continues with previous studies […]

First year of transport pipeline injection

The first year of gas injection at BIOMETAGAS LA GALERA has been completed. Gas analyses carried out by an external laboratory throughout the year, especially in the last few months, show that an excellent gas is being produced, with high methane quality and the absence of minority compounds. https://live.staticflickr.com/video/53553242833/98d6f5bacb/1080p.mp4?s=eyJpIjo1MzU1MzI0MjgzMywiZSI6MTcwODk0MTQzMiwicyI6IjU4YWE0MGZmYTYxZjU1N2QyNGQ4Y2NhYjNhMDQ1YWUyMzhhM2E2YzciLCJ2IjoxfQ In the last months of 2023, between […]

MPB. A solution to airport waste management.

AGF develops a viability study for AENA, a public company in charge of the operation, management, maintenance, and administration of airport infrastructures, about the possible construction of a biogas plant from waste generated at the Adolfo Suarez Madrid-Barajas airport. AENA has adopted several objectives: to be carbon neutral by 2026 and Net Zero by 2040. […]

Biomethane. Renewable gas in natural gas transportation pipeline.

AGF carries out the first injection of renewable gas by a private company in gas transportation pipeline. AGF has accomplished the test period for biomethane production and injection into the gas transportation pipeline. The 21st of April 2023 it was confirmed the opening of the pipeline at BIOMETAGAS LA GALERA position and normal operation for […]