With more than four years of experience injecting biomethane into the grid and in the midst of constructing two new biogas and biomethane plants that will be commissioned in 2026, AGF has consolidated its national biomethane technology with demonstrable results.
Since 2021, AGF has been successfully operating facilities that inject biomethane into distribution pipelines, continuously maintaining a gas quality with CO₂ below 1% and O₂ below 0.3%.
Furthermore, since 2023, AGF’s technology has been injecting directly into transport pipelines at over 60 bar, achieving the same standards of purity and reliability.

Operational results demonstrate the maturity and stability of the technology:

  • More than 99% of operating time producing gas in accordance with specifications.
  • More than 98% of available biogas converted into billable biomethane.
  • Water consumption of less than 2 m³ per day, thanks to an optimised process design.
  • Methane losses of less than 1.5%, even at variable flow rates, thanks to controlled flash distillation.
  • Proven adaptability to variations in flow rate and biogas composition.
  • Capacity to treat biogas with up to 2,000 ppm of H₂S, producing biomethane within specifications.
  • Effective strategies for treating vent streams, complying with odour and emission regulations.
  • Total integration: AGF’s biomethane plant incorporates chromatography and final compression for injection into high-pressure gas pipelines, all within a single compact facility.
  • 100% national technology: AGF is the only Spanish company with its own biogas and biomethane development, optimising the operation and complete integration of processes — from dome level control to final biomethane production.
Real-time data on biomethane injection from the plant using AGF technology from BIOMETAGAS LA GALERA | Injection into transport gas pipeline.

In addition to its technological leadership, AGF offers specialised operation and optimisation services, supporting developers beyond the construction phase to ensure maximum performance of their plants.

IT’S JUST WATER.

NO HUMAN ENGINEERING IS CAPABLE OF CREATING SOMETHING SIMILAR.

USE WATER, PRODUCE BIOMETHANE.

Comparte en redes:

Share on facebook
Share on twitter
Share on linkedin
Share on email