UNUE RENOVABLES SL

UNUE RENOVABLES SL PR 138 | PE 2 BM 500 Biomethane production plant. Separation by absorption in water without chemical reaction. Minimum biomethane flow 150 Nm3/h. Maximum biomethane flow 300 Nm3/h Commissioning. September 2021. First injection. 25/9/2021. Average injected flow: 210 Nm3/h. Biomethane quality: 97.5-99.5. Consumption: < 0.25kWhe/Nm3 Certified losses <1.6%. Injection pressure: 6 bar. […]
BIOMETAGAS LA GALERA SL
BIOMETAGAS LA GALERA SL PR 131 | PE 1 BMC 850 Compressed biomethane production plant. Separation by absorption in water without chemical reaction, with final compression. Minimum flow 350 Nm3/h. Maximum flow 600 Nm3/h. Nominal flow 500 Nm3/h. Commissioning. February 2022. First start-up. February 2022. First injection. 01/02/2023. Average injected flow: 500 Nm3/h. Biomethane quality: […]