URBILIZA RENOVABLES 2014

URBILIZA RENOVABLES This plant has presented serious operational problems since it came into operation. A technical intervention was performed to bring the plant into production. The full power of the plant was obtained in three months. Operated by AGF since 2014. Power production 500 kWe. 2 CHP. Plant improvement in 2018. Digestate lagoon. Plant improvement […]

WESTER KERROWGAIR Q1000 2016

WESTER KERROWGAIR The first plant built by Qila Energy, using in-house own design and development technology. The AGF team participated in all the design phases of the plant, designed and supplied the control system and was responsible for starting it up during March and April 2016. Design and commissioning by the AGF team in 2016. […]

TUXFORD Q500 2016

TUXFORD The second plant built by Qila Energy, using in-house design and development technology. The AGF team participated in all the design phases of the plant, designed and supplied the control system and was jointly responsible for starting the plant during March and April 2016. Design and commissioning by the AGF team in 2016. Power […]

UNITED KINGDOM PROJECTS

UNITED KINGDOM PROJECTS The AGF team started to work  on the projects of Qila Energy in the United Kingdom in the middle of 2015. Basic Engineering. Detail Engineering. Piping and Instrumentation Diagrams. 3D Models. Supply of prefabricated pump rooms assembled in Spain. Supply of Electrical Cabinets. Assembly in Spain. Design of the control system. PLC […]

BIOGASNALIA 2016

BIOGASNALIA AGF’s first biogas plant construction project in Spain. Turnkey  Format. 2016. Start-up September 2017. BIOGASNALIA is an exemplary waste management company that seeks to improve the service to its clients and its waste treatment process was a pioneer in industrial biogas. On a complex site, a compact high-efficiency plant was built, capable of processing […]

BIOMETAGAS LA GALERA 2020

BIOMETAGAS LA GALERA AGF’s second biogas plant project in Spain. Turnkey  Format. 2017-2019. Start-up summer 2020. BIOMETAGAS LA GALERA devised a pioneering biomethane production project  in the year 2017. The biogas plant is designed to process up to 200 t/day of organic waste.  Built in Turnkey format. Use of the gas: Production of biomethane. It […]

EXPANSION BIOGASNALIA

EXPANSION BIOGASNALIA 2021 BIOGASNALIA decided to expand the existing plant within the limitations of the site after its first few years of operation. An additional reactor was built so that production can be kept up during reactor maintenance, and to obtain longer storage times for digestate on the site. Intake flow: 90 t/day. Industrial sludges. […]