TUXFORD
The second plant built by Qila Energy, using in-house design and development technology. The AGF team participated in all the design phases of the plant, designed and supplied the control system and was jointly responsible for starting the plant during March and April 2016.
Design and commissioning by the AGF team in 2016.
Power production 500 kWe. 2 CHP.
Typical plant for the European market, fed with energy crops.