URBILIZA RENOVABLES
This plant has presented serious operational problems since it came into operation. A technical intervention was performed to bring the plant into production. The full power of the plant was obtained in three months.
Operated by AGF since 2014.
Power production 500 kWe. 2 CHP.
Plant improvement in 2018. Digestate lagoon.
Plant improvement 2021. Industrial Building. Odor treatment system. Installation of an independent safety flare.